• What We Do
    • Markets
      • Aerospace
      • Data Centers
      • EV Battery
      • Life Sciences
      • Semiconductor
      • Chemical
      • Energy
      • Oil & Gas
      • Industrial Metals
    • Construction Services
    • Featured Projects
  • Who We are
    • Our Team
    • Core Values & History
    • Life at BMWC
    • FAQ
  • BMWC Difference
  • In the News
  • Careers
    • Internship Program
    • Current Job Openings
    • Professional Development
  • Employee Access
  • Contact Us
  • Locations
  • 317-267-0400
BMWC Constructors Logo
  • Employee Access
  • Contact Us
  • Locations
  • 317-267-0400
  • What We Do
    • Markets
      • Aerospace
      • Data Centers
      • EV Battery
      • Life Sciences
      • Semiconductor
      • Chemical
      • Energy
      • Oil & Gas
      • Industrial Metals
    • Construction Services
    • Featured Projects
  • Who We are
    • Our Team
    • Core Values & History
    • Life at BMWC
    • FAQ
  • BMWC Difference
  • In the News
  • Careers
    • Internship Program
    • Current Job Openings
    • Professional Development
Our Projects View All Projects

Location: Rockport, IN

Rockport Unit 2 SCR Project

BMWC Contract
$78M Value

Market
Energy

Energy - AEP SCR
Energy - AEP SCR
Energy - AEP SCR
Energy - AEP SCR

Project Scope

BMWC Constructors partnered with AEP on the Unit 2 Selective Catalytic Reduction (SCR) Installation Project at AEP’s Rockport, IN power plant. AEP’s Rockport plant includes two 1,300-megawatt Babcock and Wilcox coal-fired units. BMWC’s scope of work involved the installation of the SCR and associated ductwork, piping, structural steel, and electrical systems.

BMWC successfully installed:

  • 3,000 tons of new SCR support structural steel
  • Three reactor trains with 2,800 tons of SCR reactor duct work
  • 300 tons of boiler house stiffening steel
  • 20,000 linear feet of pipe ranging from small bore up to 48 inches
  • Multiple utility relocations for the boiler house stiffening steel installation
  • Relocation of conduit and cabling throughout the unit

BMWC’s project execution plan was centered around the idea that modularizing the structural steel and ductwork on the ground would provide significant productivity efficiencies. The BMWC team modularized the structural steel into sections weighing hundreds of thousands of pounds. The SCR reactor was also heavily modularized and erected in 28 super modules, the heaviest of which weighed about 225 tons. All three reactor trains were set on top of the structural steel with 46 total lifts.

 

Related Projects

Indianapolis, IN

Citizens Energy Coal to Gas Conversion

April 9, 2025

Citizen’s Energy selected BMWC as its mechanical partner to convert its existing coal-fired boilers to natural gas and fuel oil. BMWC’s scope of work included the prefabrication and installation of over 6,000 feet of natural gas piping, refractory installation, burner throat construction, and component substitutions. The project was completed within a 10-month construction schedule, with <a href="https://new.bmwc.com/what-we-do/featured-projects/citizens-energy-coal-to-gas-conversion/" class="more-link">...<span class="screen-reader-text"> Citizens Energy Coal to Gas Conversion</span></a>

Read More

Michigan City, IN

Unit 12 Spring Outage

April 9, 2025

BMWC has been executing major boiler outages at NIPSCO facilities for 40+ years. When Unit 12 at NIPSCO’s Michigan City plant came due for a major outage, NIPSCO selected BMWC to execute the complex boiler outage. Several months before the scheduled outage, BMWC formed a preconstruction team consisting of project management and field execution team <a href="https://new.bmwc.com/what-we-do/featured-projects/unit-12-spring-outage/" class="more-link">...<span class="screen-reader-text"> Unit 12 Spring Outage</span></a>

Read More

  • What We Do
    • Markets
      • Aerospace
      • Data Centers
      • EV Battery
      • Life Sciences
      • Semiconductor
      • Chemical
      • Energy
      • Oil & Gas
      • Industrial Metals
    • Construction Services
    • Featured Projects
  • Who We are
    • Our Team
    • Core Values & History
    • Life at BMWC
    • FAQ
  • BMWC Difference
  • In the News
  • Careers
    • Internship Program
    • Current Job Openings
    • Professional Development
BMWC Constructors Logo
Indianapolis (Corporate)
1740 W. Michigan St

Indianapolis, IN 46222
More Locations
CONTACT:
317-267-0400

Copyright ©2025. BMWC Constructors. All rights reserved.

  • Privacy Policy
  • Terms of Use
  • Site Map
  • Site by Straight North