• What We Do
    • Markets
      • Aerospace
      • Data Centers
      • EV Battery
      • Life Sciences
      • Semiconductor
      • Chemical
      • Energy
      • Oil & Gas
      • Industrial Metals
    • Construction Services
    • Featured Projects
  • Who We are
    • Our Team
    • Core Values & History
    • Life at BMWC
    • FAQ
  • BMWC Difference
  • In the News
  • Careers
    • Internship Program
    • Current Job Openings
    • Professional Development
  • Employee Access
  • Contact Us
  • Locations
  • 317-267-0400
BMWC Constructors Logo
  • Employee Access
  • Contact Us
  • Locations
  • 317-267-0400
  • What We Do
    • Markets
      • Aerospace
      • Data Centers
      • EV Battery
      • Life Sciences
      • Semiconductor
      • Chemical
      • Energy
      • Oil & Gas
      • Industrial Metals
    • Construction Services
    • Featured Projects
  • Who We are
    • Our Team
    • Core Values & History
    • Life at BMWC
    • FAQ
  • BMWC Difference
  • In the News
  • Careers
    • Internship Program
    • Current Job Openings
    • Professional Development
Our Projects View All Projects

Location: Evansville, IN

Coating Line Installation Project

BMWC Contract
$10M Value

Market
Industrial

Project Scope

BMWC contracted with Kaiser Aluminum to execute the mechanical and electrical scopes of work to install a new coating line. The mechanical scope included erecting 200 tons of structural steel and installing 88 tons of ductwork. The electrical scope of work included terminations and fiberoptic installations.

The professionalism of our workforce, which peaked at 55 direct-hire craftspeople, and the team’s ability to coordinate work around other contractors were critical to the success of this project. BMWC collaborated with the client’s engineer during detailed clash detection reviews to avoid significant delays and added costs.  

 

 

Related Projects

Burns Harbor, IN

Cleveland-Cliffs Number 8 Boiler Outage

April 10, 2025

During the No.8 Boiler Outage at Cleveland-Cliffs in Burns Harbor, IN, BMWC removed and replaced 864 hot side generation bank tubes, 67 primary and secondary superheat pendant assemblies, and 5,680 air heater tubes. Our team also installed new valves and upgraded the piping systems to meet the latest standards and improve performance. Completed 60,000 craft <a href="https://new.bmwc.com/what-we-do/featured-projects/cleveland-cliffs-number-8-boiler-outage/" class="more-link">...<span class="screen-reader-text"> Cleveland-Cliffs Number 8 Boiler Outage</span></a>

Read More

Evansville, IN

Plant Utilities Separation Project

April 10, 2025

After selling their rolling mill and associated assets, Alcoa needed to separate plant utilities since they retained ownership of the smelter at the same facility. BMWC contracted with Alcoa to execute the complex splitting of plant utilities between the two companies. BMWC’s scope of work included electrical, civil, and mechanical work. At peak, BMWC’s direct-hire <a href="https://new.bmwc.com/what-we-do/featured-projects/plant-utilities-separation-project/" class="more-link">...<span class="screen-reader-text"> Plant Utilities Separation Project</span></a>

Read More

  • What We Do
    • Markets
      • Aerospace
      • Data Centers
      • EV Battery
      • Life Sciences
      • Semiconductor
      • Chemical
      • Energy
      • Oil & Gas
      • Industrial Metals
    • Construction Services
    • Featured Projects
  • Who We are
    • Our Team
    • Core Values & History
    • Life at BMWC
    • FAQ
  • BMWC Difference
  • In the News
  • Careers
    • Internship Program
    • Current Job Openings
    • Professional Development
BMWC Constructors Logo
Indianapolis (Corporate)
1740 W. Michigan St

Indianapolis, IN 46222
More Locations
CONTACT:
317-267-0400

Copyright ©2025. BMWC Constructors. All rights reserved.

  • Privacy Policy
  • Terms of Use
  • Site Map
  • Site by Straight North