Cleveland-Cliffs Number 8 Boiler Outage
During the No.8 Boiler Outage at Cleveland-Cliffs in Burns Harbor, IN, BMWC removed and replaced 864 hot side generation bank tubes, 67 primary and secondary superheat pendant assemblies, and 5,680 air heater tubes. Our team also installed new valves and upgraded the piping systems to meet the latest standards and improve performance. Completed 60,000 craft <a href="https://new.bmwc.com/what-we-do/featured-projects/cleveland-cliffs-number-8-boiler-outage/" class="more-link">...<span class="screen-reader-text"> Cleveland-Cliffs Number 8 Boiler Outage</span></a>